EDGE

Edge sites — unattended micro data centers

NO WATERNO CONSTRUCTIONREMOTE-FIRST

Storage and compute in offices, branches, light-industrial sites — anywhere without a proper IT room.

TDP × 1.2 · room = 1.1 × IT
SITE LOAD
2× GPU + 4× CPU/storage
IT LOAD (TDP × 1.2)
17.8 kW
ROOM MUST EXTRACT
19.6 kW
DELIVERY
1 cabinet

A mixed GPU + storage edge site lands in the low band. In warm climates the derating envelope matters — the configurator applies it automatically at 30/35 °C.

No facilities dependency

Closed loop rejects heat to room air. Only power and network required on site — the entire site survey is one page.

Remote-first

Telemetry, loop health and leak alarms stream to your NOC. Unattended does not mean unwatched.

Fast to stand up

Deliver, position, power, network — commissioned in days. The alternative is a construction project with a facilities budget.

We do not claim "runs anywhere, in any heat". Above 35 °C room air the envelope tightens materially — we publish the derating physics and apply it to your site before quoting.